ASCO Series 353 pulse valves — 2/2-way, normally closed, 2" to 2½", aluminium body with an integrated pilot — are the workhorses of reverse-pulse baghouse cleaning. Inside each one, the main diaphragm and the pilot diaphragm decide whether your dust collector keeps cleaning at peak efficiency. A tired diaphragm means weak pulses, incomplete bag cleaning, rising differential pressure and compressed-air waste that lands straight on your energy bill.
This guide condenses ASCO document 353A047-51 into a routine your maintenance team can follow in the field.
A complete internal spare part kit is available, so a diaphragm overhaul can be done in place instead of replacing the whole valve. Match the kit to the catalogue number on the nameplate.
| Catalogue number | Pipe size | Spare part kit |
|---|---|---|
| SCG353A50 | 2" | C113-685 |
| SCG353A51 | 2½" | C113-686 |
Also prepare a hex key set (M6/M8), a torque wrench, silicone grease and the valve’s exploded drawing.
Product inquiry link:
https://www.fittingspneumatic.com/sale-53287763-c113686-2-1-2-diaphragm-valve-membrane-kit-asco-type-scg353a051-pulse-valve.html
Before fitting new parts, wipe the body cavity and seat free of dust, oil and scale, and inspect the old diaphragm for cracks, swelling or a permanent set around the bleed hole.
| Position on drawing | Torque (Nm) | Torque (lbf·in) |
|---|---|---|
| A | 0.5 ± 0.2 | 5 ± 2 |
| B | 20 ± 3 | 175 ± 25 |
| C | 10 ± 1 | 90 ± 10 |
| D | 18 ± 1 | 160 ± 10 |
Cross-check the position letters against the drawing supplied with the valve. Overtightening deforms the diaphragm and shortens its life; undertightening causes internal leakage and weak pulses.
Deposits and excessive wear must not be ignored; cleaning intervals depend on the medium, dust load and duty cycle.
| Interval | Action |
|---|---|
| Weekly | Check pulse rhythm and differential pressure; listen for a clean metallic click from the pilot. |
| Monthly | Inspect the upstream filter, check air leaks at connections, confirm coil and connector seating. |
| Quarterly | Clean pilot and body cavity, verify diaphragm condition with a test pulse, check terminal tightness. |
| Annually / on wear | Full diaphragm and seal overhaul with the spare kit, then a functional and electrical test. |
Before applying pressure, run an electrical test: energise the coil several times and listen for the metallic click proving the pilot works. Wiring must be done by qualified personnel to local regulations, with tight terminals and earthing where required. Continuous-duty coils can run hot — do not touch them, and shield the valve if it is within easy reach.
Diaphragm replacement is the fastest route back to full cleaning performance, and the Series 353 design keeps it an easy in-line job when the right kit, torque values and alignment rules are respected. Keep a spare C113-685 or C113-686 on the shelf and your valves will keep pulsing on spec.
Contact: Miss.Aria
YW DKE TRADING COMPANY
📱M.P / WhatsApp: 0086 17371234005
💬QQ / Wechat: 17371234005
📩Email: Aria@ztpindustry.com
🌐Website: www.fittingspneumatic.com
Người liên hệ: Miss. NENE
Tel: 18986934683
Bộ cảm biến quang điện compact Sick WT24-2B210 Zinc Diecast Sick Diffuse Sensor
W12-2 Cảm biến khoảng cách laser bệnh tật nhựa IO-Link 2mW / Sr Cáp điều chỉnh
10V DC Sick Photodetector Sensor W12-3 2mW/Sr Cho Máy tự động hóa công nghiệp IO-Link
FESTO Bộ điều chỉnh bộ lọc không khí công nghiệp Máy bôi trơn Thép không gỉ 1 ~ 16 Bar
FESTO FRC-3/8-D-7-MINI-MPA 40μM Bộ điều chỉnh bộ lọc không khí khí
FRC-3/8-D-7-MIDI SMC Air Filter Regulator 5 Micron 1~16 Bar 40mm
SMC CY3B6TF-50 Pneumatic Cylinder hai piston 6mm 50mm -10 đến 60 °C Mức độ nhẹ
SMC CY3B20-200 Piston Pneumatic Cylinder 7 Bar Air Piston Cylinder Không đóng băng
CE SMC CY3B15TF-150 Piston Pneumatic Cylinder OEM Pneumatic Rotary Actuator